Tohatsu MFS 30 [245/319] Inspection of ptt switch

Tohatsu MFS 30 [245/319] Inspection of ptt switch
7-35
25/30 2006
7
29) Inspection of PTT Switch
1. Check electrical conductivity of PTT switch. Replace if other
than specified conditions.
Lead Wires
Switch Position
Sky Blue (Sb)
Red (R) Pink (P)
UP (Tilt Up)
Free
DOWN (Tilt Down)
9. Check electrical conductivity between terminals 2 and 3. If
non conductive, replace DOWN side PTT solenoid.
-+
DOWN
ç
B
P
2
3
MFS25_30_ch07.qxd 06.3.9 4:57 PM ページ 35

Содержание

Скачать