Tohatsu MFS 30 — установка блока PTT и газового амортизатора для лодочного мотора [242/319]

Превью страниц Страница 242 / 319
Tohatsu MFS 30 [242/319] Installation of ptt unit gas shock absorber
Bracket
7-32
25/30 2006
26)
Installation of PTT Unit/Gas Shock Absorber
1. Fully tilt up outboard motor and lock with tilt stopper 1.
2. Reinstall bushings 2, 3 and 4 to their original positions.
3. Install PTT unit 5 or gas shock absorber 6, and then
cylinder shaft (lower) 7.
4. Attach "C" ring 8.
5. Connect lead wires to battery to fully stretch tilt rod.
6. Install cylinder shaft (upper) 9 and tighten bolt 0.
7. Run PTT motor lead wires through hole and secure them
using clamps q and w and screws e.
8. Connect earth lead r to PTT unit bottom and secure with
bolt t.
9. Install thrust rod y.
Retract tilt rod a little.
1
WARNING
Be sure to lock outboard motor with tilt
stopper after tilting up. Leaving outboard
motor without locking may lead to
accidental descent due to reduction of PTT
hydraulic pressure.
5
r
4
4
y
3
3
e
e
q
w
2
0
9
8
8
7
t
t
6
2, 3 and 4 Bushings
5 PTT Unit
6 Gas Shock Absorber
7 Cylinder Pin (Lower)
8 "C" Ring
9 Cylinder Pin (Upper)
0 Bolt
q and w Clamps
e Screw
r Earth Lead
t Bolt
y Thrust Rod
MFS25_30_ch07.qxd 06.3.9 4:57 PM ページ 32

Содержание

784

Подробное руководство по установке блока PTT и газового амортизатора для лодочного мотора. Следуйте шагам для безопасной и правильной установки.