Kawasaki WORKHORSE 250 (2003) [51/322] Fuel system 3 9

Kawasaki WORKHORSE 250 (2003) [51/322] Fuel system 3 9
FUEL SYSTEM 3-9
Choke Lever and Cabl e
Choke Lever Removal
Unscrew the choke lever mounting screw [A] and take off
the plane washer and the wave washer.
Remove the choke lever [B] and free the choke cable up-
per end from the l ever.
Pull off the retaining ring [A] and free the choke cable [B]
from the switch case.
Pull the c able out of the vehicle.
Choke Lever an d Cable Installatio n
Lubricate the choke cable before installation.
Install the wave washer, plane washer and screw in that
order.
Route the choke cable according to the General Informa-
tion chapter.
WARNING
Operation with an incorrectly routed, or damaged
cable could result in an unsafe riding condition.
Choke Lever Lubrication
Whenever the choke cable is removed, lubricate the
choke lever as follows:
Apply a thin coating of multi-purpose grease to the wave
washer [A].
Choke Cable Lubrication and Inspection
Whenever the choke cable is removed or in accordance
with the Periodic Maintenance Chart in the Periodic Main-
tenance chapter, lubricate the cable.
Refer to the General Lubrication in the Periodic Mainte-
nance chapter for the cable lubrication and inspection.

Содержание

Похожие устройства

Скачать